尚未登入 請由此登入
 
 
 










知識分享平台Eshare檢視資訊View
返回前一頁Back
      [檢舉]

標題Title: Why are the leadtimes so long?
作者Authors: 林丹尼
上傳單位Department: 管理與資訊系
上傳時間Date: 2014-11-21
上傳者Author: 張嘉華
審核單位Department: 管理與資訊系
審核老師Teacher: 張嘉華
檔案類型Categories: 課堂作業Class Assignment
關鍵詞Keyword: SCM
摘要Abstract: There was a belief that the manufacturing time was too long. In fact, it as said that a lead time of 8 to 14 weeks was mainly due to the long anufacturing time although no hard data was provided to support this. Actually, items were manufactured in 2weeks and 75% of items were ompleted in 3 weeks. The manufacturing process only accounted for 5% of total leadtime. Therefore, the problem was concerning the order management and not the manufacturing process.

檔案名稱
FileName
檔案大小
Size
檔案格式
Format
瀏覽次數
Browses
下載次數
Downloads
2014_11_8eba5117.pdf 67Kb pdf 65 12
文件中檔案:
 

開啟檔案Download
 
 
返回前一頁