標題Title: How might Starck reduce or affect the lead times
作者Authors: Juliana
上傳單位Department: 管理與資訊系
上傳時間Date: 2014-11-21
上傳者Author: 張嘉華
審核單位Department: 管理與資訊系
審核老師Teacher: 張嘉華
檔案類型Categories: 課堂作業Class Assignment
關鍵詞Keyword: SCM
摘要Abstract: It seems that majority of the longest orders are actually “blanket orders”. It was initially thought that the long lead times may be related to a possibility of shortage over materials. But truth is that the problem is located way above in the order flow: in theory, the information flow related to incoming order is supposed to be controlled by the ERP SAPR/3, but in reality, the employee ignored the use of the ERP system, and a manual paper-based process is instead used for the transmission of the order from Sales service to Operations department. Indeed, it appears that there is a substantial waste of time during the SO-GI phase. That is the phase from the moment the sales entered the order in to SAP until the one the plant actually started manufacturing the goods.

檔案名稱
FileName
檔案大小
Size
檔案格式
Format
瀏覽次數
Browses
下載次數
Downloads
2014_11_dc4330b3.docx 14Kb docx 160 19
文件中檔案:
 

開啟檔案Download
 
 
返回前一頁