尚未登入 請由此登入
 
 
 










知識分享平台Eshare檢視資訊View
返回前一頁Back
      [檢舉]

標題Title: Starck may reduce lead times
作者Authors: Lizbeth
上傳單位Department: 管理與資訊系
上傳時間Date: 2014-11-21
上傳者Author: 張嘉華
審核單位Department: 管理與資訊系
審核老師Teacher: 張嘉華
檔案類型Categories: 課堂作業Class Assignment
關鍵詞Keyword: SCM
摘要Abstract: 1. The lead times became long due to the time between the orders was received and operations began working on producing the final product. Production of orders was said to take an average of about two weeks. The main problem was brought about by the process of transmitting the customer’s orders (which was done manually), as well as the current production is also one of the reasons as to why the problem exists. The production control supervisor actually mentioned that if it is not due for a long time, the order would be kept in his desk up until weeks before releasing it. This leads to a domino effect wherein the entire production system is affected, making the lead times longer than it is supposed to be. Even though the company is making use of the SAP system, they use it more for accounting/finance than planning/scheduling

檔案名稱
FileName
檔案大小
Size
檔案格式
Format
瀏覽次數
Browses
下載次數
Downloads
2014_11_bc06d9a6.docx 125Kb docx 74 1
文件中檔案:
 

開啟檔案Download
 
 
返回前一頁