尚未登入 請由此登入
 
 
 










知識分享平台Eshare檢視資訊View
返回前一頁Back
      [檢舉]

標題Title: H. C. Starck, Inc.
作者Authors: Ivan Dolinić
上傳單位Department: 管理與資訊系
上傳時間Date: 2014-11-21
上傳者Author: 張嘉華
審核單位Department: 管理與資訊系
審核老師Teacher: 張嘉華
檔案類型Categories: 課堂作業Class Assignment
關鍵詞Keyword: SCM
摘要Abstract: H.C. Starck, Inc. experienced lead times that were longer than expected because there was a belief that the manufacturing time was taking far too long, and no hard data was provided to support this. Also, Lee Sallade was the director of Operations for H.C. Starck, Inc., believed that focusing on lead time was important, focusing on it solely would be a significant error in all aspects.

檔案名稱
FileName
檔案大小
Size
檔案格式
Format
瀏覽次數
Browses
下載次數
Downloads
2014_11_bd25cdbd.docx 77Kb docx 76 28
文件中檔案:
 

開啟檔案Download
 
 
返回前一頁