標題Title: H. C. Starck, Inc.1
作者Authors: Dannis
上傳單位Department: 管理與資訊系
上傳時間Date: 2014-11-21
上傳者Author: 張嘉華
審核單位Department: 管理與資訊系
審核老師Teacher: 張嘉華
檔案類型Categories: 課堂作業Class Assignment
關鍵詞Keyword: SCM
摘要Abstract: The average lead time was estimated at 7 weeks. Average manufacturing time was 2 weeks. Analysis showed that longer more than longer time, up to 2 week, was utilized from the point the sales orders were released to the point when stock rooms issued material for processing. This process was still largely manual and SAP R/3 system was not used.