尚未登入 請由此登入
 
 
 










知識分享平台Eshare檢視資訊View
返回前一頁Back
      [檢舉]

標題Title: Reducing LeadTimes
作者Authors: Chanatip Dansirisanti
上傳單位Department: 管理與資訊系
上傳時間Date: 2014-11-21
上傳者Author: 張嘉華
審核單位Department: 管理與資訊系
審核老師Teacher: 張嘉華
檔案類型Categories: 課堂作業Class Assignment
關鍵詞Keyword: SCM
摘要Abstract: To begin, H.C. Starck, Inc. experienced lead times that were longer than expected because there was a belief that the manufacturing time was taking far too long, although no hard data was provided to support this.

檔案名稱
FileName
檔案大小
Size
檔案格式
Format
瀏覽次數
Browses
下載次數
Downloads
2014_11_f04a9f0b.docx 155Kb docx 74 5
文件中檔案:
 

開啟檔案Download
 
 
返回前一頁