尚未登入 請由此登入
 
 
 










知識分享平台Eshare檢視資訊View
返回前一頁Back
      [檢舉]

標題Title: Why the lead times so long?
作者Authors: Peter
上傳單位Department: 管理與資訊系
上傳時間Date: 2014-11-21
上傳者Author: 張嘉華
審核單位Department: 管理與資訊系
審核老師Teacher: 張嘉華
檔案類型Categories: 課堂作業Class Assignment
關鍵詞Keyword: SCM
摘要Abstract: According case study, the data showed that the average customer lead time was under 7 weeks, however the manufacturing lead time just over 2 weeks, with 75 percent complete in three weeks. One possibility is that there was a shortage of material, with no raw-material inventories from which to produce. Furthermore the problem lay in the sales order to goods issue phase – all that time between when the sales department entered the order in to SAP, and when the plant actually started manufacturing. This long lag time can be partially explained by the slow manual process of transmitting orders, and partially by the current production policy.

檔案名稱
FileName
檔案大小
Size
檔案格式
Format
瀏覽次數
Browses
下載次數
Downloads
2014_11_100e08e5.docx 104Kb docx 53 --
文件中檔案:
 

開啟檔案Download
 
 
返回前一頁