尚未登入 請由此登入
 
 
 










知識分享平台Eshare檢視資訊View
返回前一頁Back
      [檢舉]

標題Title: Fuzzy comprehensive risk evaluation of damiao tunnel
作者Authors: 胡育嘉
上傳單位Department: 電機工程系
上傳時間Date: 2011-12-30
上傳者Author: 胡育嘉
審核單位Department: 電機工程系
審核老師Teacher: 邱俊賢
檔案類型Categories: 課堂報告In-class Report
關鍵詞Keyword: fuzzy system
摘要Abstract: A fuzzy comprehensive evaluation model is established to evaluate the holistic risk level of an extra-long tunnel in north China. In the risk evaluation process of the highway tunnel, the recognized risk factors are categorized into two hierarchies, the first hierarchy comprises seven main factors, while each main factor can be further decomposed into one to six sub-factors (second-hierarchy factors).

檔案名稱
FileName
檔案大小
Size
檔案格式
Format
瀏覽次數
Browses
下載次數
Downloads
2011_12_4c32eee2.ppt 1904Kb ppt 173 18
文件中檔案:
 

開啟檔案Download
 
 
返回前一頁